PROJECTS NO. | PROJECT NAME | CONTRACTOR COMPANY | CLIENT | FACING AREA (Sqm) | PRESENT STATUS/ COMPLETION YEAR |
---|---|---|---|---|---|
1 | DESIGN,ENGINEERING,CONSTRUCTION,DEVELOPMENT,FINANCE,OPERATION AND MAINTENANCE OF JAIPUR TO REENGUS SECTION OF NH-11 (Km 246.300 TO Km 298.075) IN THE STATE OF RAJASTHAN UNDER NHDP PHASE III ON DESIGN,BUILD,FINANCE,OPERATE AND TRANSFER (DBFOT) BASIS | PATH (I) LTD,MHOW | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 50000 | DESIGN, DRAWINGS & SUPERVISION OF REINFORCED SOIL WALLS (RSW) AND REINFORCED SOIL SLOPE (RSS). COMPLETION YEAR 2012 |
2 | CONSTRUCTION OF APPROACHES ON BOTH SIDES OF ROB AT LC NO. -325 ON BARMER CHAWA-PHALSOOND-NACHNA ROAD | RAKESH CONSTRUCTION,AHMEDABAD | R.S.R.D.C. LTD., UNIT - I, JODHPUR | 2,000 | DESIGN, DRAWINGS & SUPERVISION OF REINFORCED SOIL WALLS (RSW). COMPLETION YEAR 2011 |
3 | RAJKOT-JAMNAGAR-VADINAR ROAD PROJECT (RJVRP) | L&T ECC DIVISION AHMEDABAD | GUJRAT STATE ROAD DEVELOPEMENT CORPORATION GOVERNMENT OF GUJRAT. | 5,000 | COMPLETED IN YEAR 2011 |
4 | BRIDGE AT MANPUR AT PROPOSED CHAINAGE 2+025.296 Km,UPGRADATION OF SOUTHERN BYPASS LUDHIANA | M/s HGCL-NIRAJ-SUPREME INFRASTRUCTURE PRIVATE LIMITED POWAI , MUMBAI - 400076 | PUNJAB INFRASTRUCTURE DEVELOPMENT BORD GOVERNMENT OF PUNJAB | 5,000 | DESIGN, DRAWINGS & SUPERVISION OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2013 |
5 | THE CONCEPTUAL PROFILE (4-LANE PLAN) SHOWING THE ROB IN REPLACEMENT OF EXISTING L.C. NO. C-7 AT KM 2.532 ON RKB-JSM SECTION NEAR BHADWASIYA IN JODHPUR CITY | ANANTA PROCON PVT. LTD. | JODHPUR DEVELOPMENT AUTHORITY, JODHPUR | 2,500 | DESIGN, DRAWINGS & SUPERVISION OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2012 |
6 | FOUR LANING OF MHOW-GHATABILLOD ROAD PROJECT ON DBFOT | DILIP BUILDCON,BHOPAL | MADHYA PRADESH ROAD DEVELOPMENT CORPORATION | 18,000 | DESIGN, DRAWINGS & SUPERVISION OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2013 |
7 | CONSTRUCTION OF RAILWAY OVER BRIDGE ACROSS PALANPUR-GANDHIDHAM B.G.RLY. LINE IN LIEU OF L.C. NO. 2A AT RLY.KM.2/3-2/4 ON MEHSANA - PALANPUR SH-41 NEAR PALANPUR. | ANANTA PROCON PVT. LTD. | R & B DEPARTMENT, GOVT. OF GUJARAT. | 5,000 | DESIGN, DRAWINGS & SUPERVISION OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2012 |
8 | ROHTAK-BAWAL ROAD PROJECT (SECTION NH-71) IN THE STATE OF HATYANA. (PROOF CHECKING OF DESIGN & DRAWING OF REINFORCED EARTH WALL FOR OUR ROHTAK-BAWAL ROAD PROJECT.) | JMC PROJECTS (INDIA) LTD. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 6,000 | PROOF CHECKING OF DESIGNS OF RSW USING POLYMER STRIPS AND SUBMISSION OF STABILITY REPORT OF BULGED RSW COMPLETED IN 2011 |
9 | PROPOSED ROB AT L.C. NO. 181 ON NH-11 A EXTENSION AT DAUSA | COLOSSAL CONSTRUCTION, JAIPUR | R.S.R.D.C. LTD., JAIPUR | 5,000 | DESIGN, DRAWINGS & SUPERVISION OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2013 |
10 | PROPOSED BARMER ROB AT LC NO.323A | PUNGLIA CONSTRUCTION,JODHPUR | RAJASTHAN URBAN SECTOR DEVELOPMENT INVESTMENT PROGRAM (RUSDIP) PHASE II - JAIPUR RAJASTHAN | 5,000 | COMPLETED 2012 |
11 | SIX LANNING OF CHILAKALURIPET-NELLORE SECTION OF NH-5 FROM Km 1182.802 TO Km 1316.00 IN THE STATE OF ANDHRA PRADESH,ON DBFOT BASIS | BSCPL, HYDERABAD | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 2,00,000 | DESIGN, DRAWINGS & SUPERVISION OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2015 |
12 | CONSTRUCTION OF AUTOMOTIVE TEST TRACKS AND ASSOCIATED WORK | SUPREME INFRASTRUCTURE PRIVATE LIMITED POWAI , MUMBAI - 400076 | NATRIP,MANESAR | 5,000 | DESIGNS & DRAWINGS COMPLETED 2013 |
13 | CONSTRUCTION OF R.O.B AT KALAMBOLI,NAVI MUMBAI | J.M.MAHATRE,PANVEL,NAVI MUMBAI | CIDCO | 2,500 | DESIGN, DRAWINGS & SUPERVISION OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2013 |
14 | R.O.B. AT L.C. NO. 160,SURAT BARODA BROAD GAUGE RAILWAY LINE AT Km 296/26-28 | RAJKAMAL BUILDERS INFRASTRUCTURE PVT. LTD.SURAT | R&B DEPARTMENT,GUJRAT | 5,000 | DESIGN, DRAWINGS & SUPERVISION OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2013 |
15 | “FOUR-LANNING OF PANVEL-INDAPUR SECTION OF NH-17 FROM Km 0+000 TO 84+000 IN THE STATE OF MAHARASHTRA UNDER NHDP PHASE-III ON BOT BASIS (Package No. NHDP-III/DL4/05” | SUPREME INFRASTRUCTURE PRIVATE LIMITED POWAI , MUMBAI - 400076 | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 15,000 | DESIGN, DRAWINGS & SUPERVISION OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2016 |
16 | CONSTRUCTION OF R.O.B. AT WESTERN RING ROAD,RW-2, SCHEME No. 151, INDORE (M.P.) | M/s KALYAN TOLL INFRASTRUCTURE LTD.,INDORE (M.P.) | INDORE DEVELOPMENT AUTHORITY,INDORE (M.P.) | 4,000 | DESIGN, DRAWINGS & SUPERVISION OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2014 |
17 | CONSTRUCTION OF RAILWAY F.O.B. AT SAYAN GUJRAT | M/s RAJKAMAL BUILDERS,SURAT,GUJRAT | R&B DEPARTMENT,GUJRAT | 3,200 | DESIGN, DRAWINGS & SUPERVISION OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2014 |
18 | FOUR LANNING OF ORISSA BORDER-AURANG SECTION FROM Km:88+000 TO Km:239+000 OF NH-6 IN THE STATE OF CHHATTISGARH TO BE EXECUTED AS BOT (TOLL) ON DBFOT PATTERN UNDER NHDP PHASE-IV | BSCPL, HYDERABAD | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 60,000 | DESIGN, DRAWINGS & SUPERVISION OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2016 |
19 | SUMERU HILL, MHOW (SPORTS COMPLEX) | AKSHAY INFRASTRUCTURE,MHOW | 1,000 | DESIGN, DRAWINGS OF WRAPPEDNAROUND REINFORCED SOIL WALLS (RSW) FOR SPORTS COMPLEX COMPLETION YEAR 2015 | |
20 | DEVELOPMENT OF UJJAIN-SIMHASTHA BYPASS ON BOT (TOLL+ANNUITY) BASIS:ANALAYSIS OF BULGED WALL | M/s KALYAN TOLL INFRASTRUCTURE LTD.,INDORE (M.P.) | MADHYA PRADESH ROAD DEVELOPMENT CORPORATION | 10,000 | DESIGN, DRAWINGS & SUPERVISION OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2015 |
21 | NAGPUR-WAINGANGA ROAD PROJECT AT NH-6 (FROM Km 498.000 TO 544.200 IN THE STATE OF MAHARASHTRA | JMC PROJECTS (INDIA) LTD. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 6,000 | PROOF CHECKING OF DESIGNS OF RSW USING POLYMER STRIPS AND SUBMISSION OF STABILITY REPORT OF BULGED RSW COMPLETED IN 2016 |
22 | PROPOSED CONSTRUCTION OF 2 LANE ROAD OVER BRIDGE IN LIEU OF LEVEL CROSSING NO. 21 AT KM:34.909 BET. FL.-DNA SEC. | M/S VISHNU PRAKASH "R" PUNGALIA PVT. LTD., JODHPUR | NORTH WESTERN RAILWAY, JODHPUR |
10,000 | DESIGN, DRAWINGS & SUPERVISION OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2016 |
23 | CONSTRUCTION OF R.O.B ON NERUL URAN RAILWAY LINE AT CH 21015 NEAR PROPOSED URAN RAILWAY STATION AT DRONAGIRI,NAVI MUMBAI | J.M.MAHATRE,PANVEL,NAVI MUMBAI | CIDCO | 2,500 | DESIGN, DRAWINGS & SUPERVISION OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2017 |
24 | RSW APPROACHES TO GRADE SEPRATOR AT CH: 88+638 FOR THE PROJECT REHABILITATION, UPGRADATION AND WIDENING OF THE NAGDA-DHAR-GUJARI TWO LANE ROAD PROJECT (SH-31) ON EPC FROM Km. 68+800 to 138+300. | M/S MAA NARMADA AGROTECH AND INFRASTRUCTURES LTD./ PATH (I) LTD. |
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION | 10,000 | DESIGN, DRAWINGS & SUPERVISION OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2018 |
25 | ENGINEERING & DESIGN CONSULTANCY SERVICES FOR DEVELOPMENT, MAINTENANCE AND MANAGEMENT OF SIX LANING OF JAIPUR RING ROAD FROM AJMER ROAD TO AGRA ROAD SECTION AT JAIPUR IN THE STATE OF RAJASTHAN ON DBFOT (TOLL) BASIS (APPROX 47 Km LENGTH) |
SUPREME INFRASTRUCTURE PRIVATE LIMITED POWAI , MUMBAI - 400076 | JAIPUR DEVELOPMENT AUTHORITY |
10,000 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2017 |
26 | CONSTRUCTION OF ROAD OVER BRIDGE (R.O.B.) AT SUKET RAMGANJMANDI ROAD L.C. NO. 82-B | MANGLAM BUILDCON, ANKLESHWAR, GUJRAT | PROJECT DIRECTOR, R.S.R.D.C. LTD., RAMGANJMANDI | 1,550 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2017 |
27 | PROPOSED ROAD OVER BRIDGE (R.O.B.)NEAR NEEM KA THANA RAILWAY STATION , IN LIEU OF L.C.-76 AT KM 102/01 RAJASTHAN | JCC INFRAPROJECTS PVT. LTD., AJMER | RAJASTHAN URBAN INFRASTRUCTURE & FINANCE DEVELOPMENT CORPORATION LTD. (RUIFDCO) | 2,100 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2017 |
28 | CONSTRUCTION OF ROB APPROACHES BETWEEN Km 383/3 TO 384/3 NEAR VASEDI VILLAGE ON NH-56 (DEPOSIT WORK) ON CHOTA UDEPUR-FERKUVA ROAD (SH), DIST: VADODARA | ROYAL INFRA ENGINEERING PVT. LTD. BAMROLI ROAD, SURAT-395002 |
NATIONAL HIGHWAY DIVISION (Government of Gujrat Undertaking) |
10,500 | DESIGN, DRAWINGS & SUPERVISION OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2018 |
29 | FOUR LANNING FAGNE-GUJRAT-MAHARASHTRA BORDER SECTION OF NH-6 FROM Km 510.00 TO Km 650.794 (PACKAGE 3) IN THE STATE OF MAHARASHTRA TO BE EXECUTED AS BOT (TOLL) PROJECT ON DBFOT PATTERN UNDER NHDP PHASE 3 | INTERBUILD INFRASTRUCTURE PVT. LTD. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 15,000 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2018 |
30 | EMABNKMENT STABILITY ANALYSIS FOR BRIDGE ON THE RIVER FULAHAR AT NAKATTI POINT IN THE DISTRICT OF MALDA, WEST BENGAL | M/s S. P. SINGLA Construction Pvt. Ltd. Panchkula-134113, Haryana | GOVERNEMNT OF WEST BENGAL, PUBLIC WORKS (ROADS) DIRECTORATE NATIONAL HIGHWAY WING | Ground Improvemnet for 8.00m High Embankment (Length 1Km) | COMPLETED MARCH 2017 |
31 | RSW BHIWANDI (Compound Wall for Building Complex) | ASHAPURA DEVELOPER | THANE MUNICIPAL CORPORATION | 800 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2019 |
32 | ROB IN RAJASTHAN LC 53,70,74 AND 75 SOJAT, JAWALI, RANI | VISHNU PRAKASH "R" PUNGLIA LIMITED JODHPUR (VPRPL-RBIPL "JAWALI" JV) |
DFCCIL, AJMER | 49,000 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2017 |
33 | ROB IN RAJASTHAN (JAISALMER) | GR INFRA PROJECTS LTD. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 16,792 | DESIGN, DRAWINGS, SUPERVISION, GEOGRID SUPPLY, CASTING & ERECTION OF BLOCK FACIA OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2019 |
34 | FOUR LANNING OF KAGAVADAR-UNA SECTION OF NH-8E FROM KM 139.915 (DESIGN CH: Km 140.470) TO Km 180.478 (DESIGN CH: Km 181.450) IN THE STATE OF GUJRAT THROUGH (PPP) ON HYBRID (ANNUNITY) MODE UNDER NHDP PHASE IV | AGROH INFRASTRUCTURE DEVELOPERS PVT. LTD. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 31,259 | DESIGN, DRAWINGS & SUPERVISION OF REINFORCED SOIL WALLS (RSW) AND REINFORCED SOIL SLOPE (RSS). COMPLETION YEAR 2019 |
35 | ROB IN RAJASTHAN (ABU ROAD) | ASHISH CONSTRUCTION | RAJASTHAN STATE ROAD DEVELOPMENT CORPORATION LIMITED | 5,000 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2019 |
36 | CONSTRUCTION OF RAILWAY OVER BRIDGE AT CROSSING NO. 427 MALGADA FATAK TO BHADROLI GWALIOR, MADHYAPRADESH | MANGLAM BUILDCON, ANKLESHWAR, GUJRAT | THE CHIEF ENGINEER P.W.D. BRIDGE CONSTRUCTION ZONE, BHOPAL, MADHYAPRADESH |
5,000 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2018 |
37 | FOUR LANNING OF GWALIOR-SHIVPURI SECTION OF NH-3 FROM KM 15+600 OF NH-75 TO KM 236+000 OF NH-3 IN THE STATE OF MADHYAPRADESH ON BOT (TOLL) UNDER NHDP PHASE IV ON DBFOT PATTERN (END OF GWALIOR BYPASS) | PATH (I) LTD,MHOW | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 5,350 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2018 |
38 | CONSTRUCTION OF BALANCE SERVICE ROADS IN THE SIX LANE SECTION OF NH-3 DEWAS-INDORE (KM 591.000 TO 610.000 & FROM KM 0.00 TO 12.60) IN THE STATE OF MADHYA PRADESH | DINESHCHANDRA R. AGRAWAL INFRACON PVT. LTD. AHMEDABAD, GUJARAT | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 8,000 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2018 |
39 | DETAILED ENGINEERING SERVICES FOR DEVELOPMENT AND UPGRADATION OF EXISTING 2-LANE TO 4-LANE CONFIGURATION STRETCH OF NH-17 (NEW NH-66) FROM KM 205.400 (PARSHURAMGHAT)TO KM 241.300 (ARAWALI)IN THE STATE OF MAHARASHTRA UNDER NHDP-IV ON HYBRID ANNUITY MODE (PACKAGE II) |
M/s CHETAK ENTERPRISES LTD. |
NATIONAL HIGHWAYS AUTHORITY OF INDIA | 35,000 | DESIGN, DRAWINGS, SUPERVISION, GEOGRID SUPPLY, CASTING & ERECTION OF PANEL FACIA OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2020 |
40 | CONSTRUCTION OF 2-LANE ROB AND ITS APPROACHES AT K.M. +5.60 OF NH-86 ON KATNI BINA RAILWAY LINE AT LC NO. 30 AT RAILWAY CH: 1056/6-8 ON CHHATARPUR TO SAGAR ROAD BETWEEN MAKRONIA-SAGAR STATIONS. | VVC RETAIL INFRA PVT. LTD., RAGHOGARH, GUNA (M.P.) | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS, GOVERNMENT OF INDIA ACTING THROUGH THE CHIEF ENGINEER (N.H.), PUBLIC WORKS DEPARTMENT, BHOPAL |
3,200 | DESIGN, DRAWINGS & SUPERVISION OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2019 |
41 | RMA - BPL NEW (B.G.) RAIL LINE PROJECT ROAD OVER BRIDGE NO. LC 8 AND 18 |
VISHNU PRAKASH "R" PUNGLIA LIMITED JODHPUR | WEST CENTRAL RAILWAY KOTA DIVISION |
19,000 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2020 |
42 | V.U.P. AT CHAINAGE 141+398 BALANCE WORK OF 4-LANING OF MUZAFFARNAGAR-HARIDWAR SECTION OF NH58 (Km 131 TO Km 211) - PACKAGE 1: MUZAFFARNAGAR TO START OF ROORKEE BYPASS DESIGN CHAINAGE Km 130.360 TO Km 167.200 ON ITEM RATE BASIS |
M/s RAJ SHYAMA CONSTRUCTION PVT. LTD. SHRI KRISHNA & CO. - AB INFRAZONE PVT. LTD. (JV) GHAZIABAD-201002 |
NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF ROAD, TRANSPORT & HIGHWAYS GOVERNMENT OF INDIA) |
7,000 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2020 |
43 | CONSTRUCTION OF SIX LANE FLYOVER BRIDGE ON BENGALI CHOURAHA (RING ROAD) IN INDORE CITY (M.P.) | M/s K. G. GUPTA INFRASTRUCTURE PVT. LTD. (GOVT. CONTRACTOR) INDORE (M.P.) |
OFFICE OF THE CHIEF ENGINEER P.W.D. BRIDGE CONSTRUCTION ZONE BHOPAL (M.P.) (NIRMAN BHAWAN II FLOOR ARERA HILLS BHOPAL) |
1,744 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2021 |
44 | CONSTRUCTION OF ROB. IN BETWEEN OHET 1225/27-29 UP TRACK & 1225/28-30 DOWN TRACK IN GWALIOR YARD ON TANSEN ROAD TO RACE COURSE ROAD IN GWALIOR CITY. |
M/s ANUPAM, CONSTRUCTION COMPANY GREATER NOIDA, U.P. |
THE CHIEF ENGINEER BRIDGE CONSTRUCTION ZONE, BHOPAL (M.P.) |
4,700 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2021 |
45 | REHABILITATION AND UP-GRADATION OF SINDOOR RIVER TO START OF BARELI BYPASS SECTION ON NH-12 FROM EXISTING KM 130/10 TO KM 194/0 (DESIGN CH 130.000 TO 193.000) TO FOUR LANE WITH PAVED SHOULDERS IN THE STATE OF MADHYAPRADESH | BANSAL CONSTRUCTION WORKS LTD., BHOPAL | MPRDC | 17,457 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2020 |
46 | Four Laning of Amravati-Chikhli section of NH-6. Package-I from km 166.000 (Amravati) to km 220.000 (Near Kurankhed)] in the state of Maharashtra to be executed on Hybrid Annuity Mode under Bharatmala Pariyojna. |
M/s RAJPATH INFRACON PRIVATE LIMITED, PUNE | NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF ROAD, TRANSPORT & HIGHWAYS GOVERNMENT OF INDIA) |
79,881 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2021 |
47 | FOUR LANING OF HARDA TO TEMAGAON FROM KM 0.000 TO KM 30.000 (HARDA-BETUL PKG-I) ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJNA PHASE-I IN THE STATE OF MADHYA PRADESH |
M/s HARDA PATHWAYS PVT. LTD. PLOT NO. 76, MALL ROAD, MHOW - 453441, INDORE MADHYA PRADESH |
NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF ROAD, TRANSPORT & HIGHWAYS GOVERNMENT OF INDIA) |
25,000 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2021 |
48 | CONSTRUCTION OF RAILWAY OVER BRIDGE AT L.C. No. 18 AT NASIRABAD AII-COR SECTION RLY. Km 3/2-3 | VISHNU PRAKASH "R" PUNGLIA LIMITED JODHPUR | NORTH WESTERN RAILWAY, AJMER DIVISION | 6,258 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2022 |
49 | PROPOSED R.O.B. AT L.C. No. 108 AT KM. 565/1-2 AND DFC CH.92375 BETWEEN BANS - SIROHI STATION (BANAS YARD) ON MADAR - PALANPUR SECTION OF AJMER DIVISION NORTH WESTERN RAILWAY. | VISHNU PRAKASH "R" PUNGLIA LIMITED JODHPUR (VPRPL-RBIPL "JAWALI" JV) |
DFCCIL, AJMER |
18,695 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2022 |
50 | DETAILED CONSULTANCY ENGINEERING SERVICES FOR RE WALL APPROACHES TO PROPOSED R.O.B. (1X24.00M) SPAN OF COMPOSITE GIRDER AT CH:3526 KM 1202/5-6 IN CONNECTION WITH DIVERSION OF UP/DN MAIN LINE BETWEEN BRRG (KM-1200/6) TO PFR (1207/2) STATION OF GUNA-MAKSI SECTION, DUE TO CONSTRUCTION OF MOHANPURA DAM AT RAJGARH DIST. | M/s RAJLAXMI CONSTRUCTION, GUNA | NORTH WESTERN RAILWAY, BHOPAL | 6,000 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2022 |
51 | FOUR LANING OF CHICHOLI TO BETUL SECTION (HARDA- BETUL PKG-III) OF NH-47 (OLD NH-59A) FROM DESIGN CH. 81+000 TO DESIGN CH. 121+248 (LENGTH 40.248 KM) UNDER BHARATMALA PARIYOJNA PHASE-I ECONOMIC CORRIDOR) IN THE STATE OF MADHYA PRADESH. | M/s BANSAL CONSTRUCTION WORK PVT. LTD., BHOPAL-462016 (M.P.) | NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF ROAD, TRANSPORT & HIGHWAYS GOVERNMENT OF INDIA) |
29,050 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2022 |
52 | ONSTRUCTION OF 4-LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LC No. 328A AT KM. 0+500 ON NH-25E ON BARMER-JASAI CROSSING BARMER MUNABAO RAILWAY LINE IN DISTRICT BARMER ON EPC MODE IN THE STATE OF RAJASTHAN . | M/S VISHNU PRAKASH "R" PUNGALIA PVT. LTD., JODHPUR | (MINISTRY OF ROAD, TRANSPORT & HIGHWAYS GOVERNMENT OF INDIA) PD CUM SUPERINTENDING ENGINEER, GOVERNMENT OF RAJASTHAN PUBLIC WORKS DEPARTMENT (NH CIRCLE) JODHPUR |
2,445 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2022 |
53 | PROJECT: CONSTRUCTION OF 4-LANE ROB FROM DESIGN CHAINAGE AT KM 0.000 (KM. 102 OF NH - 325) TO DESIGN CHAINAGE AT KM. 1.060 IN LENGTH OF 1.060 KMS IN LIEU OF EXISTING LC NO. C-48 (BALOTRA - SIWANA - JALORE - SANDERAO ROAD) AT JALORE IN THE STATE OF RAJASTHAN ON EPC MODE. | M/S VISHNU PRAKASH "R" PUNGALIA PVT. LTD., JODHPUR | (MINISTRY OF ROAD, TRANSPORT & HIGHWAYS GOVERNMENT OF INDIA) PD CUM SUPERINTENDING ENGINEER, GOVERNMENT OF RAJASTHAN PUBLIC WORKS DEPARTMENT (NH CIRCLE) JODHPUR |
4,318 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2022 |
54 | UPGRADATION OF BALOTRA TO SANDERAO VIA JALORE SECTION OF NH 325 IN THE STATE OF RAJASTHAN ON EPC MODE PACKAGE - IV. | M/S VISHNU PRAKASH "R" PUNGALIA PVT. LTD., JODHPUR | GOVERNMENT OF RAJASTHAN PUBLIC WORKS DEPARTMENT |
1,49,062 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2024 |
55 | FOUR LANING OF SAGAR TO MOHARI SECTION NH-934 FROM DESIGN KM. 8.000 TO 50.300 (TOTAL DESIGN LENGTH 42.3KM) IN THE STATE OF MADHYA PRADESH UNDER BHARAT MALA PARIYOJANA ECONOMIC CORRIDOR ON EPC MODE PACKAGE-I. |
M/s BANSAL CONSTRUCTION WORK PVT. LTD., BHOPAL-462016 (M.P.) | NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF ROAD, TRANSPORT & HIGHWAYS GOVERNMENT OF INDIA) |
29,925 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2023 |
56 | FOUR LANNING OF RATAPANI STRETCH FROM Km. 8.300 TO Km. 20.680 (LENGTH 12.380 KM.) OF OBEDULLAGANJ-BUDHNI SECTION OF NH-46 (OLD NH-69) IN THE STATE OF MADHYA PRADESH ON ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) MODE. |
M/s BANSAL CONSTRUCTION WORK PVT. LTD., BHOPAL-462016 (M.P.) | NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF ROAD, TRANSPORT & HIGHWAYS GOVERNMENT OF INDIA) |
18,775 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2023 |
57 | FOUR LANING OF KODINAR - VERAVAL SECTION OF NH-8E FROM KM 221.610 (DESIGN CHAINAGE KM 222+400) TO KM 263.000 (DESIGN CHAINAGE KM 263+180) AND FROM KM 120.900 TO KM 121.150 OF NH 8D (PACKAGE VI) IN THE STATE OF GUJARAT THROUGH (PPP) ON HYBRID (ANNUITY) MODE UNDER NHDP PHASE IV. | M/s KALTHIA ENGINEERING & CONSTRUCTION. LTD., GUJRAT | NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF ROAD, TRANSPORT & HIGHWAYS GOVERNMENT OF INDIA) |
17,205 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2023 |
58 | FOUR LANING OF NH119 FROM BEHSUMA AT KM 39.250 (EX. KM 39+240) TO BIJNOR AT KM 78.810 (EX. KM 86+590) (DESIGN LENGTH= 39.560 KM) IN THE STATE OF UTTAR PRADESH ON HYBRID ANNUITY MODE. | M/s GAWAR CONSTRUCTION LTD. GURUGRAM,HARYANA 122001 |
NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF ROAD, TRANSPORT & HIGHWAYS GOVERNMENT OF INDIA) |
16,199 | DESIGN, DRAWINGS OF REINFORCED SOIL SLOES (RSS) COMPLETION YEAR 2025 |
59 | CONSTRUCTION OF 4 - LANE ROB AT RAILWAY CHAINAGE 200378 ON BODA-PACHOR- NARSINGHGARH ROAD IN RAMGANJ BHOPAL NEW RAILWAY LINE PROJECT. | M/s RAJ LAXMI CONSTRUCTION, GUNA-473001 | WEST CENTRAL RAILWAY, BHOPAL |
4,650 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2025 |
60 | CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER CONFIGURATION OF KHILCHIPUR BYPASS OF LENGTH 5.500 KM, FROM KM 0+000 TO 5+500, TOTAL DESIGN LENGTH 5.500 KM SECTION OF NH-752B IN THE STATE OF MADHYA PRADESH UNDER EPC MODE. |
M/s SBCC INFRA PVT. LTD., JODHPUR, RAJASTHAN |
M. P. PUBLIC WORKS DEPARTMENT NATIONAL HIGHWAY DIVISION RAJGARH (M. P.) |
6,762 | DESIGN, DRAWINGS OF REINFORCED SOIL SLOES (RSS) COMPLETION YEAR 2025 |
61 | CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER CONFIGURATION OF BYPASS (WITH PROVISION OF NEW ROB) TO MANDAL TOWN (DISTRICT BHILWARA) WITHC ONNECTING NH-158 (FROM KM 109+900 OF NH-158) TO NH-48 (KM 395+340 OF SERVICE ROAD OF NH-48) IN THE STATE OF RAJASTHAN ON EPC MODE. | M/S VISHNU PRAKASH "R" PUNGALIA PVT. LTD., JODHPUR | (MINISTRY OF ROAD, TRANSPORT & HIGHWAYS GOVERNMENT OF INDIA) EXECUTIVE ENGINEER & PROJECT DIRECTOR PROJECT IMPLEMENTATION UNIT,BEAWAR MINISTRY OF ROAD TRANSPORT & HIGHWAYS |
9,392 | DESIGN, DRAWINGS OF REINFORCED SOIL WALLS (RSW) COMPLETION YEAR 2025 |